I will give address of this location for film shooting for $2

United States
CREATED FRIDAY NOVEMBER 4 2016, IN LOCATIONS

The bridge has a total span of 11,288 ft, 2.12-mile long bridge. The 90-degree turn mid-span serves to make the bridge long enough to achieve a 4.67 percent grade, allowing the bridge enough height to clear an empty aircraft carrier. The roadway consist of five lanes. The center lane doubles as a safety median, and with the help of a new moveable barrier system as a switch lane to provide three lanes in one direction during peak traffic periods.

ORDER NOW!
  • N/A POSITIVE RATING by 0 VOTES
  • INSTANT
  • 0 ORDERS
    IN QUEUE
  • PLACE YOUR ORDER NOW!
N/A OVERALL
RATING